Details:
-
Client:
ERENCO - Erdemir Engineering Management and Consulting Services Inc.
-
Date:
2009
-
Location:
AZERBAİJAN, Baku
-
Construction Area
25.550 m2
-
Category:
Power & Energy
BAKU WASTE TO ENERGY PROJECT (Wte)
Preparation of architectural, reinforced concrete, steel construction application projects of the largest “Waste Incineration and Grinding Facility” in the region. As a non-hazardous waste incineration plant, the plant has an annual capacity of 500,000 tons of solid waste.